What we do

Jobs at Group Jansen

Sustainability

News

Our Locations

info@groupjansen.com

+32 11 79 92 00

Sustainability

News

Our Locations

info@groupjansen.com

+32 11 79 92 00

VIB – Zwijnaarde

VIB – Zwijnaarde

VIBZwijnaarde The Flemish Institute for Biotechnology built a state-of-the-art bio-incubator on the technology campus in Zwijnaarde. Group Jansen was responsible for the complete interior finishing of this innovative building. Challenge The challenge was to finish...
AZ Sint-Maarten – Mechelen

AZ Sint-Maarten – Mechelen

AZ Sint-MaartenMechelen For AZ St-Maarten, Group Jansen was responsible for the interior finishing of medical-technical zones and patient rooms. Challenge Strict requirements for hygiene, technology, and safety: that was the challenge at AZ St-Maarten. Each space had...
Anicura – Antwerp

Anicura – Antwerp

AnicuaAntwerp Anicura created a modern veterinary clinic where patients, owners and staff feel comfortable. Group Jansen provided the interior design and technical systems. Challenge Operating rooms, consultation spaces, and reception areas had to be built according...
Rockfon – Wijnegem

Rockfon – Wijnegem

RockfonWijnegem In this project, Rockfon demonstrates how acoustics and design reinforce each other. Group Jansen handled the installation of top-quality acoustic ceilings and walls. Challenge To create a showroom that is both functionally and aesthetically appealing....
Punch Powertrain – Sint-Truiden

Punch Powertrain – Sint-Truiden

Punch Powertrain Sint-Truiden For Punch Powertrain, Group Jansen completed the interior finishing of offices and test zones, where precision and innovation are central. Challenge Limiting vibrations, guaranteeing air quality and maintaining aesthetics: this required...