QRS
Berchem
QRS was realized with a focus on quality, sustainability, and functionality. Group Jansen created an environment that perfectly meets the client’s needs and the building’s intended use.
Challenge
The QRS project presented the challenge of combining technical complexity with tight deadlines and high finishing standards. Thanks to a multidisciplinary approach, the project was successfully delivered.
Facts
Result
The ‘small contribution’ that Group Jansen made to this Nearly Zero-Energy Building was a significant one.
As the general contractor for this project, we were not only responsible for the demolition work but also handled the interior finishing. Floor finishing, painting, electrical work, etc. We did it all!
Interesting fact: when constructing these nearly zero-energy offices, we installed no less than 2,479 m² of island-style activated comfort ceilings. Additionally, we also installed non-active panels in the corridors, which provide lighting and an impressive aesthetic touch.
Notably: QRS opted for black climate ceilings which, together with the chosen concrete look, emphasize the robust character of their Nearly Zero-Energy Building.
They went before you.
Projects and references.
Every day we create unique places to be. Buildings and spaces where you love to live, work, heal, or enjoy. Discover some impressive projects from our Jansen family below.